Warning: file_put_contents(): open_basedir restriction in effect. File(/opt/rasp/logs/plugin/plugin.log.2024-12-02) is not within the allowed path(s): (/www/wwwroot/ppbbu/5256789.com/:/tmp/) in /www/wwwroot/ppbbu/5256789.com/index.php on line 55
Warning: file_put_contents(/opt/rasp/logs/plugin/plugin.log.2024-12-02): failed to open stream: Operation not permitted in /www/wwwroot/ppbbu/5256789.com/index.php on line 55
Warning: [OpenRASP] 20002 Fail to open php_stream of /opt/rasp/logs/plugin/plugin.log.2024-12-02! in /www/wwwroot/ppbbu/5256789.com/index.php on line 55 unit performance calculation例句_unit performance calculation英汉例句_unit performance calculation双解例句_绿查网谷歌词典
The performance requirement, composition of spindle unit and the rigidity calculation of spindle bearing and unit for CNC30 NC lathe are discussed in this paper. 介绍CNC30数控车床主轴组件的性能要求和组成,以及主轴轴承、主轴组件的刚度计算。
The steam-gas power ratio of a single-shaft gas-steam combined cycle unit is an important parameter for performance calculation of the entire unit, and it cant be obtained directly from measurement. 单轴燃气-蒸汽联合循环(单轴联合循环)机组蒸汽与燃气功率(蒸燃功)比是整个机组性能计算的重要参数,但无法直接测量得到。
Several effective measures to improve unit performance are raised. With the off-design calculation, thermal economics analysis of steam system is conducted. 并利用联合循环蒸汽系统变工况计算方法、计算并分析不同运行方式的热经济性。